A takeoff is half a day
Partitions to linear feet, ceiling and flooring to square feet, fixtures counted, then converted to crew-days and dumpster pulls. By the time it is done, three other bids came in.
Interior & selective demolition
Forty bid invitations a month, and you price the twelve you have time for. The other twenty-eight go to whoever answered. Timber takes the plan set or the walkthrough photos, does the takeoff, prices it off your book, and hands you a bid to edit — so the answer stops being silence.
Why this desk
Nobody in this trade is short of bid requests. Everybody is short of the hours it takes to answer one.
Partitions to linear feet, ceiling and flooring to square feet, fixtures counted, then converted to crew-days and dumpster pulls. By the time it is done, three other bids came in.
You bid the GCs you know and the jobs that look clean. The rest get no answer at all — which is how you quietly fall off an invitation list.
Haul-off is a real share of the number and it moves with tipping fees, material mix and how much you can divert. Guess low twice and the year is gone.
Hidden material behind the wall, a slab that is not what the drawing said. The change order gets written next week, if anybody writes it.
The method
01
Forward the bid email with the plan set attached, or send photos from the walkthrough. Timber reads what it can, then asks the questions that actually move a demo number: occupied or vacant, shift, access, protection, who hauls.
02
Quantities by assembly — partitions, ceilings, flooring, casework, MEP strip. It converts to crew-days at your production rates and dumpster pulls at your hauler's rate. Every line shows the quantity it came from.
03
You edit the number and the exclusions, then it goes out with the qualifications that keep you out of trouble. If the GC goes quiet, Timber drafts the follow-up. If conditions change on site, it drafts the change order that day.
On the board
Same operator for a tenant improvement strip-out and a nights-and-weekends job in an occupied tower.
From inbound to close
This is not about bidding faster on the jobs you already bid. It is about the ones you never answered. A bid you decline in writing keeps you on the list. A bid you ignore takes you off it.
On the desk
A drawing gives quantities. A walkthrough video gives conditions. Timber takes either and tells you which questions it still needs answered.
Square feet per man-hour by assembly, your loaded labor rate, your hauler. It prices like your estimator does, not like a national average.
Hazardous material, MEP disconnect, shoring, patching. The qualifications you always mean to include are on the bid instead of in your head.
A photo from the foreman and a sentence becomes a priced change order draft while the GC is still standing in the room.
Manpower, hours and dumpster pulls come back by SMS. No field app for a crew that turns over between jobs.
Crew-days and disposal weight land on the job. You see which assemblies you underpriced before you bid the next one the same way.
Ask a demo contractor what he needs and he will not say leads. His inbox is already full of invitations to bid — plan sets from general contractors, scope letters, walkthrough requests. The constraint is not demand. It is that a real takeoff costs half a day of an estimator who is also running two jobs, so most of what arrives gets no answer.
That silence is expensive twice. You lose the job you did not bid, and after enough silences the GC stops sending them. The list you spent ten years getting on quietly shortens.
Timber attacks the specific hour that causes it. Forward the invitation and it reads the plan set or the photos, produces quantities you can check against the drawing, converts them to crew-days at your production rates, and prices haul-off at what your hauler actually charges. You correct it, set the exclusions, and send. When the GC goes quiet it drafts the nudge. When the slab is not what the drawing said, it writes the change order that afternoon instead of next month.
Still yours
01
Timber proposes and shows its work. You sign off. It will not send a bid without you, and every line traces back to a quantity you can check.
02
A drawing is not a building. Somebody still walks it. Timber turns what you saw into a priced scope — it does not pretend it was there.
03
It will tell you what a job is worth and what the risk lines are. Deciding you do not want that GC is still yours.
Demolition estimators
Send a plan set or scope letter you were about to no-bid, plus the rates you would have used. We will run the takeoff and show you the quantities and the number. If it cannot read your drawings, we will say so.
Or write ivan@felicita.group
Also on Timber
FAQ
Still deciding? Book a demo and we'll walk through your workflow live.
Contact our teamIt produces quantities from the document and shows each one, so you can check it against the drawing. On a clean plan set that is close. On a bad scan it will tell you what it could not read rather than invent a number.
No. It removes the retyping and the measuring so your estimator reviews and prices instead of counting partitions. The judgment calls stay with the person whose name is on the bid.
Yes. Square feet per man-hour by assembly, your loaded rate, your hauler and tipping fees live in a skill. It will not price off a national average.
It carries the exclusion by default and flags where a survey is missing. If you also do abatement, the two scopes sit on one job record.
No. Bids and change orders are drafts until you approve them. Follow-ups are drafts too.
That works. It reads the scope letter, asks what the letter leaves out, and prices from your rates. Photos from the walkthrough make it sharper.
Forward one bid invitation. Get a priced demolition bid back to edit — same day, off your own rates.